We Survived the Tunnel!!
24 May 2016
As part of the Outdoor Education curriculum the Key Stage 3 students were tasked with riding through the Netherton Tunnel. The tunnel is 2,768 m long and is pitch black. This is a real challenge and the students responded excellently.
Posted by Scott Worton
Category: Secondary